If you complete those above, when can NSL developer starting
Bishan to Marina Bay?
According to their site, the next stage for them to do is to add
the station object and we start to see some on Jurong East (And not
for other stations for now). According to joey, he said that only
front 25m of the station will come with such textures because these
enhancement lags the route.
I seriously suggest a lite version to it, but the problem is the
developer will have to require a bigger storage size since both
lite and high quality (usual) version are not compatible (Such as
lite version uses the generic station / or front 25m with textures
as shown by joey while full version is exact duplicate of real
world when fully completed.)
Hint: For me, EWL PSR - JKN route is considering one such, when
the lite version will omit full tunneling on City Hall - Raffles
Place and no tunneling on both side of tracks except on the station
+ / - 50m or so. Next time can even have a station with full object
similar with his.
Eh, now JEMP almost completed. Can use post-JEMP tracks or
not?